Back to (Offices)
Back to Projects Gallery
Centre Pointe IV
Location:
West Chester, OH
Customer:
Duke Construction
Date:
12/1/2004
Size of Facility:
147,000 sq. ft.
Description:
200 ton
© Copyright 2004 George Steel Fabricating, Inc.
Site hosted by
Scheidler Web Solutions