Back to (Industrial)
Back to Projects Gallery
Patheon Phase III
Location:
Cincinnati, Ohio
Customer:
Messer Construction
Date:
11/1/2010
Size of Facility:
12,550 sq. ft.
Description:
187 Tons
© Copyright 2004 George Steel Fabricating, Inc.
Site hosted by
Scheidler Web Solutions