Back to (Industrial)
Back to Projects Gallery
Clopay
Location:
Deerfield Township, OH
Customer:
Cincinnati United Contractors
Date:
9/1/2001
Size of Facility:
70,200 sq. ft.
Description:
180 ton
© Copyright 2004 George Steel Fabricating, Inc.
Site hosted by
Scheidler Web Solutions